Turnkey Projects

As a Pharmaceutical Turnkey Project consultant,  We Provide Complete solution to Pharmaceutical Manufacturing plant set-up for:

  • Formulations (Tablets, Capsules, Oral Liquid, External Preparations, Sterile Injectables)
  • APIs
  • Excipients

PROJECT FEASIBILITY STUDIES

  • We carry out analysis of a proposed project to determine whether it is feasible or not.
  • Feasibility Studies will include:
    • Economic Feasibility
    • Technical Feasibility
    • Operational Feasibility
    • Schedule Feasibility

PROJECT REPORT PREPARATION

Comprises of:

  • Building construction details
  • Supporting utilities details
  • Plant equipment details
  • Quality control instruments details
  • Plant accessories details
  • Technical requirement details
  • Financial details

SITE MASTER PLAN PREPARATION

Comprises of:

  • Key Plan
  • Site Plan
  • Building Orientation
  • Utility Block Placement
  • Administrative Arrangements

FACILITY DESIGNING

Comprises of:

  • Basic Technical Plan Layout
  • Section and Elevation Drawings
  • Area Table with detailed Containment
  • Nomenclature with necessary approval 

DETAILED ENGINEERING DESIGNING

Comprises of:

  • Basic Design
  • Technical Datasheet
  • Bought Out Quantity list

STRUCTURAL & ARCHITECTURAL DESIGNING

Comprises of:

  • Soil Evaluation
  • Load Requirements
  • Structural details
  • Load Bearing Calculations
  • Interior and Exterior 3D imposements
  • Overall Elegance Management

URS PREPARATION

Comprises of:

  • Required Standards of cGMP
  • Output requirements
  • Load Calculation
  • Automation requirements
  • Cost Effectiveness

VENDOR OPTIMIZATION

Comprises of:

  • Vendor assessment with respect to technical capabilities, timelines, delivery schedules, maintenance, etc.
  • URS compatibility
  • Dynamic balance between quality and economy

PROJECT EXECUTION & MANAGEMENT

Comprises of:

  • Project review based on design drawings
  • Phase wise target completion
  • Project flow direction
  • Troubleshooting and streamline execution

COMMISSIONING

Comprises of:

  • Facility Qualification
  • Report preparation and review
  • Finishing and elegance

TECHNICAL DOCUMENTATION

Comprises of:

  • Facility Proficiency Portfolio
  • Regulatory Documentation
  • Audit Compliance Compatibility
  • WHO GMP consultancy
  • GMP consultancy